Panel block system and how to properly install them.
T j panel septic system cost.
The panel system was created primarily because of insufficient space for conventional systems.
Drain lines are not nearly as long.
The t j panel offers a 50 reduction on total line lengths in the state of north carolina meaning the area.
Backfill sand shall be a clean screened medium grade sand that is naturally occurring.
The backfill sand used in t j panel systems is crucial to the long term success of the septic system.
A new septic tank system costs 3 918 to install on average with prices ranging from 1 500 to upward of 5 000 most homeowners spend between 3 280 and 5 040 for a 1 250 gallon system that supports 3 or 4 bedrooms.
T j panels are considered to be a 50 reduction system.
Meaning where a normal drain field would use 100 ft the t j panels would only.
It works quite well and maintenance is similar to that of a conventional gravity system.
Contact a design.
The system allows for installation of a septic system where it wouldn t be possible otherwise due to required absorption field area.
This system is relatively new and works like a gravity system in areas that have deep soil but few pockets of soil.
T j panels recommends an installation training for each orientation of the panel block system both horizontal and vertical.
Allow t j panels to assist you with technical advice in designing pressure manifolds with panel block systems.
Illustrations of the t j panel system.
Septic tank system cost.
A t j panel system is an alternate septic treatment system that is installed in place of the standard drain field in a septic system.
T j panels look like 6 cement blocks that have been epoxied together.
Contact our offices to schedule your install training at 704 924 8600.
Illustrations of the t j panel wastewater treatment system design resources for the t j panel wastewater treatment system.
Isometric vertical installation.
Please contact our offices if you have any backfill sand related questions.